Skip to main content

The journey to reusables for Berkeley Unified School District (BUSD) has been long and transformative. It began with discovery meetings in 2018 and was propelled forward by a dedicated team of students, teachers, administrators, parents, and local organizations. Heightened awareness over excessive single-use packaging during COVID, urgency to achieve zero emissions by 2050 through reductions in greenhouse gas emissions tied to disposable food packaging, and the impact of recent State and local policies mandating recycling were all critical factors that galvanized the decision to untether from disposable foodware. But the most pivotal driving force was the collective recognition that transitioning to reusable serviceware not only stops trash but empowers students with everyday sustainable habits for healthier lives.

By transitioning from single-use disposable food packaging to less-toxic durable alternatives at just 3 out of 16 schools, BUSD expects to eliminate 46,000 single-use utensils and 73,000 single-use trays in a given school year.

Business Profile:

Berkeley Unified School District (BUSD) is located in Berkeley, California with a student population of 9,801 and serves food for breakfast (classroom and cafeteria), lunch, and Child And Adult Care Food Program. BUSD is comprised of 11 elementary schools, 3 middle schools, one high school, and one alternative school. The average daily participation in school meals at the elementary and middle schools is 6,000 students for breakfast and 2,500 students for lunch. All food is prepared and distributed from the central scratch kitchen located at King Middle School.

In 2024, BUSD successfully implemented the first phase of reuse deployment at three schools: Cragmont Elementary School, John Muir Elementary School, and Martin Luther King Middle School. These schools were selected as the first cohort due to their existing dishwasher infrastructure, on-site staff capacity, and earlier return to the cafeteria.

The total cost for reusable stainless steel trays, sporks, cups, and bowls for 10 schools amounted to $52,970 that was funded primarily by the non-profit organization Plastic Free Restaurants. Rather than hiring additional staff, BUSD expanded the Nutrition Services Assistant job description by one hour, effectively creating a full-time position.

With a 180-day school year, the three participating schools collectively serve approximately 2,000 meals, daily. By transitioning from single-use disposable food packaging to less-toxic durable alternatives at just 3 out of 16 schools, BUSD expects to eliminate 46,000 single-use utensils and 73,000 single-use trays in a given school year. This change also includes replacing disposable cups and bowls with reusable alternatives, resulting in a total reduction of 170,000 single-use items per school year. This transformation diverts over 6,600 lbs of waste annually, equivalent to 4.3 pounds of trash per student. After the initial deployment of reuse, BUSD, annually saves more than $13,000 by cutting back on the purchase of disposable foodware. These annual savings are now available for other essential budgetary needs.

The students love the reusables, especially the older ones. It gives them a sense of eating on a plate like at home. My team thinks it’s increased the number of students eating school lunches and makes the food look more appealing.

 Bonita Everfield, Cragmont Cafeteria Supervisor
 

Recommendations Implemented:

In 2024, BUSD successfully implemented the first phase of reuse deployment at three schools: Cragmont Elementary School, John Muir Elementary School, and Martin Luther King Middle School. These schools were selected as the first cohort due to their existing dishwasher infrastructure, on-site staff capacity, and earlier return to the cafeteria.

The total cost for reusable stainless steel trays, sporks, cups, and bowls for 10 schools amounted to $52,970 that was funded primarily by the non-profit organization Plastic Free Restaurants. Rather than hiring additional staff, BUSD expanded the Nutrition Services Assistant job description by one hour, effectively creating a full-time position.

New Reusable Foodware

  • Stainless steel sporks — eliminated the need for separate spoons and forks
    $1.16 each, includes shipping
  • Greensteel 10-ounce stainless steel cups
    $2.50 each, includes shipping
  • Ahimsa 3-compartment stainless steel trays
    $8.50 per unit
  • 10-ounce and 16-ounce double-walled stainless steel bowls
    $5.96 each, includes shipping

Challenges

Keeping high return rates on reusables is an important challenge that needs to be overcome in a K-12 school reuse system. Having higher value reusables makes them feel more valuable to students (and adults) and this helps BUSD keep their loss rate very low. Still, utensils can often end up in the landfill or other waste bins. Here are a few simple ways to prevent utensils from being accidentally thrown away:

  • Pair them with other larger reusables that match in material. The idea being, stainless steel trays do not end up in the trash, so stainless steel sporks should not either.
  • Have clear signage and reuse return stations next to every refuse bin. Make sure that they are at eye level for the students.
  • Start bussing stacks with a sample item and separate trays from the utensils and cups — this will help students see that “this is where the utensils go”, ”this is where the cups go”, “this is where the trays go”.
  • Have green teams or bin monitors direct students on what goes where, particularly after the launch and at the beginning of the school year.
  • Have open bins so if a student does throw away utensils, they can reach in and correct the mistake.
  • Make sure the students can’t bend or break the utensils

To Be Continued...
The first wave of reuse deployment at BUSD highlighted the overarching waste issues at their schools. This work uncovered practical ways to green the District, resulting in significant waste reduction and annual net savings. BUSD plans to conduct a longitudinal waste assessment, which may reveal further opportunities to reduce costs by scaling back refuse hauling services.

Now, more than ever, the District is focused on continuing reuse efforts at additional schools with plans to have all schools transitioned by the Fall of 2026. The second phase will include the Berkeley Technology Academy, Malcolm X Elementary School, Oxford Elementary School, Ruth Acty Elementary School, Thousand Oaks Elementary School, and Willard Middle School. Projected metrics for second phase reuse deployment at a total of 9 schools show even greater benefits with annual reductions of 547,500 pieces of single-use foodware, weighing over 19,965 pound, resulting in annual net savings of nearly $40,000.

Additionally, BUSD aims to eliminate plastic packaging in its universal breakfast program. The Nutrition Service Department is reviewing contracts with local vendors who can provide the District with bulk cereal and is collaborating with the Sustainability Program to identify stainless steel packaging options.

Keep in Touch
Clean Water Fund and the Center for Environmental Health look forward to expanding BUSD’s reuse and waste reduction efforts, as outlined in the initial version of their case study. Please keep in touch to learn about additional initiatives and updated waste reduction data.
 

The reusables make my job a lot easier. The compost bin isn’t half as full as it used to be because there are no paper trays so I don’t have to switch the bag out as much. There’s still food waste that I wish didn’t exist but it’s all a work in progress.

 Jackie Ray Jr, Cragmont Lead Custodian

Business Information:

2020 Bonar Street
Berkeley, CA 94702
United States

Document
Institution Case Study: Berkeley Unified School District July 2024 | Phase One
BUSD Implementation Timeline
BUSD Student Reactions

The Bottom Line

Highlights

  • Successfully piloted reusable foodware at two elementary schools and one middle school serving a total of 1,545 students
  • Replaced 9 single-use foodware items with 4 reusable items
  • Phase 1 resulted in $13,064 annual savings; Phase 2 will achieve $39,144 annual savings
  • Phase 1 reduced waste by 3.3 tons (6,685 pounds), every school year; Phase 2 will reduce waste by 10 tons (19,965 pounds), every school year
  • Annually eliminated 170,000 individual single-use items in Phase 1; 547,500 annually in Phase 2
  • Upgraded a part-time Nutrition Services Assistant to full time by adding one additional hour per day to manage new wares
  • Potentially reduces students’ exposure to chronic sources of PFAS

 

170,000 pieces

Disposable Items Eliminated Annually

6,685 lbs

Annual waste reduction

$13,064

Annual Net Cost Savings

The students love the reusables, especially the older ones. It gives them a sense of eating on a plate like at home. My team thinks it’s increased the number of students eating school lunches and makes the food look more appealing.

-
Bonita Everfield, Cragmont Cafeteria Supervisor
ReThink Disposable - Stop waste before it starts

Reducing Single-Use Food Packaging

ReThink Disposable works with local governments, businesses and institutions, and consumers of single use food packaging to inspire a cultural shift away from single-use "throwaway" lifestyle.

Learn More

Related Case Studies

University Taqueria, Berkeley

With the help of our ReThink Disposable Zero Waste Specialists, University Taqueria was able to remove 52,664 items from the waste stream every year, and totally eliminate disposables from their dine-in service!

Casa Do Petisco, Berkeley

With the help of our ReThink Disposable Zero Waste Specialists, Casa Do Petisco is eliminating 24,074 individual pieces of single use disposables and will be saving over $3,000 annually!

Harrington Elementary School, Lexington, MA

Harrington Elementary School in Lexington, Massachusetts, serving 363 students, became the district’s second school to adopt reusable cafeteria trays and cutlery after replacing a broken dishwasher with a new energy-efficient model. Funded through a combination of state budget support, a community grant, and district funds, the $80,000+ investment improved kitchen efficiency, upgraded infrastructure, and streamlined operations.